Mastering the Art of Installing Kick Out Flashing- A Comprehensive Guide

How to Install Kick Out Flashing

Installing kick out flashing is an essential step in ensuring the integrity and durability of your roofing system. Kick out flashing is designed to prevent water from entering the roof at the edges, where it is most susceptible to leaks. This article will guide you through the process of installing kick out flashing, step by step.

Materials and Tools Needed

Before you begin, gather all the necessary materials and tools. You will need:

– Kick out flashing material (usually aluminum or stainless steel)
– Nails or screws
– Caulk
– Utility knife
– Hammer or nail gun
– Tape measure
– Level
– Chalk line

Step 1: Measure and Cut the Kick Out Flashing

Start by measuring the length of the kick out flashing you need. It should extend beyond the roofline by at least 2 inches. Use the utility knife to cut the flashing to the desired length.

Step 2: Position the Kick Out Flashing

Position the kick out flashing along the edge of the roof where it meets the wall or other vertical surface. Ensure that it is level and that it extends beyond the roofline as measured.

Step 3: Attach the Kick Out Flashing

Using the hammer or nail gun, attach the kick out flashing to the roof deck. Make sure to nail or screw it securely at intervals of no more than 6 inches. Be sure to nail or screw through the flashing into the roof deck, not just the roofing material.

Step 4: Apply Caulk

Apply a bead of caulk along the bottom edge of the kick out flashing where it meets the wall or other vertical surface. This will help seal any gaps and prevent water from entering the building.

Step 5: Secure the Flashing to the Wall

If the kick out flashing is not already attached to the wall, use nails or screws to secure it. Ensure that the flashing is tight against the wall and that there are no gaps.

Step 6: Inspect and Adjust

After installing the kick out flashing, inspect the installation for any gaps or loose areas. Adjust as necessary by adding additional nails or screws or by reapplying caulk.

Step 7: Final Touches

Once the kick out flashing is securely installed and sealed, inspect the area for any additional water protection measures that may be needed, such as additional weatherproofing or sealant.

By following these steps, you can ensure that your kick out flashing is installed correctly and will provide the necessary protection for your roofing system. Remember, proper installation is key to preventing leaks and maintaining the integrity of your roof.